Supplier Directory Subscribe
Advertisement
Advertisement
Advertisement
Advertisement
Home / CenterLine Issued High Speed Fastener Welding Patent

CenterLine Issued High Speed Fastener Welding Patent

Their innovative High Speed Fastener Welding System integrates both process and product improvements for handling multiple applications with one machine.

Posted: July 13, 2018

The High Speed Fastener Welding System boasts vast improvements in overall cycle times and comprehensive error-proofing features to optimize quality and production output. It has the capability to quickly re-configure the system for new part structures to maximize equipment flexibility and up-time. The system can also be modified and/or updated to satisfy new application conditions or completely new projects. It also has the ability to disassociate the operator work from the production process cadence to remove cycle time dependency from the operator and reduce an employee’s exposure to repetitive motions.
Advertisement
Advertisement

CenterLine Limited (Windsor, ON) announced that the United States Patent and Trademark Office has issued U.S. Patent 9,895,775 for their High Speed Fastener Welding System. This innovative production assembly equipment integrates both process and product improvements resulting in a fastener welding solution that is exceptionally suited to handling multiple applications with one machine. “This development encapsulates our best practices and lessons learned used to overcome the challenges our customers face with production fastener welding,” stated Larry Koscielski, the vice president of process and technology development at CenterLine. “Our High Speed system has optimized all of the motions of the process while raising the bar on part quality, ease of maintenance and production flexibility.  This system is a game changer for any manufacturer involved with fastener welding.“

Extensive design, development and field beta testing has resulted in a system that boasts important key benefits to customers including:

  • Vast improvements in overall cycle times and comprehensive error-proofing features to optimize quality and production output.
  • The capability to quickly re-configure the system for new part structures to maximize equipment flexibility and up-time. The system can also be modified and/or updated to satisfy new application conditions or completely new projects.
  • The ability to disassociate the operator work from the production process cadence to remove cycle time dependency from the operator and reduce an employee’s exposure to repetitive motions.

As of June 1, CenterLine has delivered over 30 of these systems to various Tier 1 facilities in North America. Some of these systems are processing over 8,000 fasteners per day. In some systems, up to 38 different parts are processed with minimal changeover. The High Speed Fastener Welding System represents a significant evolution in CenterLine’s existing industry leading technology and is consistent with their corporate vision to “develop, produce, and deploy innovative, cost-effective, trusted and complete solutions that enable our customers to exceed their operational, customer and profit commitments, while minimizing their risk and stress”.

Integral components of the High Speed Fastener Welding System include the PinPoint Solution, the Quick Fastener Placement Unit (QFP) and the SoftMount Welding Gun package(s). To date, CenterLine has been awarded over 82 patents and has numerous North American and international patents pending.

www.cntrline.com

Subscribe to learn the latest in manufacturing.

Calendar & Events
Southeast Design – 2-Part Show
September 11 - 12, 2013
Greenville, SC
Mid-Atlantic Design – 2-Part Show
September 25 - 26, 2013
Phoenixville, PA
CMTS of Canada
September 30 - October 3, 2013
Mississauga, Canada
DISCOVER 2013
October 8 - 16, 2013
Florence, KY
Wisconsin Manufacturing and Technology Show
October 8 - 10, 2013
Wisconsin State Fair Park Exposition Center Halls B&C
WESTEC 2013
October 15 - 17, 2013
Los Angeles, CA
SOUTH-TEC
October 29 - 31, 2013
Greenville, SC
New England Design-2-Part Show
October 30 - 31, 2013
Marlborough, MA
DMG / Mori Seiki Manufacturing Days
November 12 - 15, 2013
Mori Seiki Manufacturing – Davis, CA
FABTECH
November 18 - 21, 2013
McCormick Place – Chicago, IL
Midwest Design-2-Part Show
November 20 - 21, 2013
Northern Kentucky Convention Center – Covington, KY
PCD Tool Manufacturing
November 20, 2013
United Grinding North America – Fredricksburg, VA
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement