Supplier Directory Subscribe
Advertisement
Advertisement
Advertisement
Advertisement
Home / UNPRECEDENTED REDUCTIONS IN CLEANING CYCLE TIMES

UNPRECEDENTED REDUCTIONS IN CLEANING CYCLE TIMES

This Wheelabrator blast wheel significantly increases the wear life of blades and reduces cycle times by 20 to 50 percent for increased productivity.

Posted: March 26, 2010

Advertisement
Advertisement

Saving money on overall wheel blast operating costs and maintenance expenses is more important now than ever before. This Wheelabrator (La Grange, GA) wheel (introduced in 2003) has a proven track record, with over 2,000 units successfully installed on a variety of blast equipment. Serving a wide range of applications and industries, EZEFIT® wheel installations have assisted customers in achieving unprecedented reductions in cycle time along with a significant increase in the wear life of blades. Customers have reported reductions in cycle times ranging from 20 to 50 percent and increased productivity within their facilities.

The EZEFIT mounting hardware allows for upgrades on most wheel blast machine (Wheelabrator and non-Wheelabrator) that include Tumble Blast, Spinner Hanger, Monorail, Table, and Railcar Shot Blast systems.

Now available with a unit bearing for belt-driven applications, the EZEFIT wheel contains all of the features and benefits of the direct drive wheel. Additional features include (1) elimination of a mounting base plate, (2) a 50 percent reduction in both vibration and wheel assembly time, and (3) fail-safe wheel component alignment.

—————————————————————–

Wheelabrator Group, [email protected]

Subscribe to learn the latest in manufacturing.

Calendar & Events
SEMA
November 5 - 8, 2024
Las Vegas, NV
Design-2-Part Show
November 19 - 20, 2024
Nashville, TN
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement